connect now
Cancel
Cancel
Cancel
  •  
    The audit team from Central Office discusses Regular Audit and IQA procedures with District Engineer Alvin A. Ignacio (rightmost) and section chiefs.
  •  
    Glenn Lagman (in blue shirt and khaki shorts) of Samar First District Engineering Office gets a first- hand experience in handling drone operation.
  •  
    Personnel from the Maintenance Section and PIO Staff of the Samar First District Engineering Office join forces to assist motorists.
  •  
    Engr. Carlos Rañola (right) during a project inspection.
  •  
    The construction of flood control structure along Tinambacan River will start on this site.
  •  
    On this site, 586.00 lineal meters of flood mitigating structures will be constructed which will serve as an extension to the existing flood control in Oquendo, Calbayog City.
  •  
    The farm to market road connecting Brgy. Panaruan and Brgy. Can-ipulan, Sta. Margarita, Samar.
  •  
    Delegates and DPWH employees attend the flag raising ceremony at the DPWH Covered Court.
  •  
    (L to R) City Engr. Marlo Resulta, MPP Mario Balani, CCDHO Atty. Anthony Singzon, Cong. Edgar Mary Sarmiento, DE Alvin Ignacio, City Engr. Restituto Monsanto, RROW Coordinator Anthony Baltazar and Maintenance Chief Engr. Ramon Calagos
  •  
    Perspective of the plan for Calbayog Coastal Diversion
    
recent photos
post an article
post news photo
other stories
views
8,031
share
Home
photo album
it's more fun
blogs
about
 
government agencies
(with news feed in the past 7 days)
ugnayan © 2018
online: 
65 visitors